Top Ad
I DIG Radio
www.idigradio.com
Listen live to the best music from around the world!
I DIG Style
www.idigstyle.com
Learn about the latest fashion styles and more...

Aus-SA semi-final: All eyes on the weather in Kolkata

Written by 
Published in Cricket
Monday, 13 November 2023 19:33

With the 2023 ODI World Cup having reached the knockout stages, reserve days come into play for the semi-finals on November 15 and 16 and then the final on November 19. While there is virtually no chance of them being needed when India face New Zealand in Mumbai, there is the prospect of rain impacting the Australia-South Africa clash in Kolkata so here's a rundown of how things work.

Is the forecast that worrying for Kolkata?

Well, as ever, it depends which website you look at, but there is certainly a reasonable threat of rain playing a part. At the moment, Friday looks the more problematic day, with Thursday, the scheduled day of the semi-final, having a prediction of around a 50% chance of seeing showers.

When does the reserve day come into play?

Before activating the reserve day, the umpires will make every effort to complete the match on the scheduled day, including reducing the game to a minimum of 20 overs per side. Only if this isn't possible does the extra day come into play. A reserve day was needed in the 2019 semi-final between India and New Zealand at Old Trafford.

If a match isn't completed on the scheduled day, and the reserve day is used, there are basically two scenarios for how the match is played out depending on when the final rain interruption has come.

Courtesy of the ICC playing conditions, here are two working examples:

Example 1: Match starts at 50 overs per side and there is an interruption at 19 overs. Overs are reduced to 46 overs per side and play is about to resume. Before another ball is bowled it rains and play is abandoned for the day. As the match did not resume under the revised overs, the match should continue on the reserve day at the original 50 overs per side with the overs reduced if necessary during the reserve day.

Example 2: The same start as in example 1 i.e. match starts at 50 overs per side and there is an interruption at 19 overs. Overs are reduced to 46 overs per side and play is about to resume. This time, play starts and after an over has been bowled it rains and play is abandoned for the day. As the match has resumed, it is continued on the reserve day at 46 overs per side with the overs further reduced if necessary during the reserve day.

What happens if there's a no result?

If a minimum of 20 overs per side is not possible across the two days and the match is a no result, the team that finished higher in the group stage will progress to the final. That means it would be South Africa who go through to the decider in Ahmedabad on November 19 (where it is very unlikely to rain).

Read 103 times

Soccer

Napoli honor Maradona on anniversary of passing

Napoli honor Maradona on anniversary of passing

EmailPrintOpen Extended ReactionsNapoli fans and club officials paid tribute to Diego Maradona on th...

Ronaldo double bolsters Al Nassr's ACL place

Ronaldo double bolsters Al Nassr's ACL place

EmailPrintOpen Extended ReactionsCristiano Ronaldo netted a pair of goals in Al Nassr's Asian Champi...

Raya warns Arsenal of 'in-form' Gyökeres' threat

Raya warns Arsenal of 'in-form' Gyökeres' threat

EmailPrintOpen Extended ReactionsDavid Raya has warned his Arsenal teammates that Sporting CP forwar...

2026 FIFA


2028 LOS ANGELES OLYMPIC

UEFA

2024 PARIS OLYMPIC


Basketball

Morant back for Grizzlies after missing 8 games

Morant back for Grizzlies after missing 8 games

EmailPrintOpen Extended ReactionsMEMPHIS, Tenn. -- Ja Morant was in the lineup Monday night for the...

Rockets' VanVleet hit with $50K fine for tirade

Rockets' VanVleet hit with $50K fine for tirade

EmailPrintOpen Extended ReactionsRockets guard Fred VanVleet was fined $50,000 by the NBA on Monday...

Baseball

Ex-big leaguer Chirinos joins O's as bench coach

Ex-big leaguer Chirinos joins O's as bench coach

EmailPrintOpen Extended ReactionsBALTIMORE -- Robinson Chirinos replaced Fredi González on Monday as...

MLB alters Rays' schedule; 69 of last 103 on road

MLB alters Rays' schedule; 69 of last 103 on road

EmailPrintOpen Extended ReactionsNEW YORK -- Major League Baseball switched a pair of series involvi...

Sports Leagues

  • FIFA

    Fédération Internationale de Football Association
  • NBA

    National Basketball Association
  • ATP

    Association of Tennis Professionals
  • MLB

    Major League Baseball
  • ITTF

    International Table Tennis Federation
  • NFL

    Nactional Football Leagues
  • FISB

    Federation Internationale de Speedball

About Us

I Dig® is a leading global brand that makes it more enjoyable to surf the internet, conduct transactions and access, share, and create information.  Today I Dig® attracts millions of users every month.r

 

Phone: (800) 737. 6040
Fax: (800) 825 5558
Website: www.idig.com
Email: This email address is being protected from spambots. You need JavaScript enabled to view it.

Affiliated